A 16,500 SF Senior Living Renovation in Middleton, WI
Middleton Glen Independent Living Retirement Community has stood at 6720 Century Ave in Middleton, Wisconsin since 1999. Twenty-five years later, Aro Eberle Architects took the lead on a 16,500 SF renovation of their shared amenity spaces — breathing new life into the heart of this established senior living community in Middleton, WI.
Goals That Guided the Design
To ensure the renovation would truly serve the people who call Middleton Glen home, our team began by listening. Working alongside a resident committee, our architectural and interior design team defined five core goals for the senior living renovation:
Create a welcoming, home-like atmosphere
Foster community connection and social engagement
Maximize natural daylight and improve artificial lighting
Enhance vibrancy and visual interest
Improve functionality and acoustic quality
Connectivity as a Design Principle
With these goals established, a single organizing idea emerged to bring them together. Connectivity drove every design decision throughout the project. Strategic floor plan adjustments strengthened the flow between primary amenity spaces, while soft, welcoming curves replaced rigid transitions. Natural materials, warm lighting and thoughtfully selected finishes layered together to improve both acoustic performance and tactile richness across all 16,500 SF of renovated space.
Designed With Residents, For Residents
Good design solves problems — great design reflects the people it serves. Our team engaged directly with the residents who live and gather in these spaces daily, drawing on their needs, preferences and lived experiences to shape every design decision. The result goes beyond a beautiful space — it feels like home.
A Phased Renovation With Minimal Disruption
Delivering meaningful change in an occupied community requires as much care in the process as in the design itself. Aro Eberle structured the project across three phases to keep disruption to a minimum. Phase I reached completion in August 2025, with Phase II on track for June 2026 and Phase III targeting December 2026 — allowing residents to continue enjoying their community throughout the entire renovation.